Elbro AGBack to product
SBIOT240Commissioning without a display

Commissioning manual

Operational procedure for connecting the controller, associating it with an installation and validating the applied I/O configuration. Electrical installation and wiring must already be complete and inspected.

01
Before powering up

Complete the following checks before beginning network setup or device association.

  1. 1Verify the product model, hardware revision, power supply, terminal markings and protective devices.
  2. 2Have access to a 2.4 GHz Wi-Fi network and its credentials; for WPS, use only the network prepared for switchButler IoT.
  3. 3Create or use an authorised Control Room account and prepare the installation to which the controller will be assigned.
02
SBIOT240 front-panel sequence

SBIOT240 uses the same installation and Control Room workflow but has no display and no Bluetooth setup. Start network setup and read its status only through the front-panel procedure issued for the installed hardware revision.

01

Power and status

Power the inspected controller and verify the documented front indication.

02

Network setup

Start the revision-specific front-panel network procedure.

03

Connection

Wait for the documented ready indication before opening device association.

04

Associate device

Complete the association from the Control Room using the identification method supplied for the revision.

03
Installation and device association

The controller must belong to an installation and to the authorised users of that installation. A customer record is not the device owner.

  1. 1Register or sign in to the Control Room and create the installation if it does not already exist.
  2. 2Open the installation, select Add device and use Bluetooth, the QR code or manual entry according to the information shown by the controller.
  3. 3Confirm the association, then assign a clear device name and its physical location.
  4. 4Verify that the controller appears online in the installation before continuing with I/O configuration.
04
Configure relays and digital inputs

Field wiring defines the electrical signal; platform configuration defines how each channel is interpreted and which operational action or event follows.

  1. 1Name every relay and input according to the connected circuit and physical location.
  2. 2For each input, select enabled or disabled and the correct mode: contact closed to common, contact open, voltage present or voltage absent.
  3. 3Set alarm and restore delays to filter contact bounce or brief transitions without hiding relevant states.
  4. 4Create the required event rules, recipients and authorised actions; configuration does not replace electrical or functional safeguards.
  5. 5Apply the configuration and wait until the device reports the updated revision before testing channels.
Contact closed to common
Contact open
Voltage present
Voltage absent
05
Functional test and handover

Test the complete installation under controlled conditions before handover.

  1. 1Operate every input and verify its normal, alarm and restored states in the Control Room.
  2. 2Test every relay only after confirming the connected load and the required de-energized state.
  3. 3Verify behaviour after sensor loss, temporary network loss, power interruption and controller restart where applicable.
  4. 4Record the final configuration, installation location and authorised users, then hand over only the functions intended for the operator.